{"id":89517,"date":"2024-07-17T06:01:00","date_gmt":"2024-07-17T04:01:00","guid":{"rendered":"https:\/\/thediplomatinspain.com\/?p=89517"},"modified":"2024-07-16T22:35:48","modified_gmt":"2024-07-16T20:35:48","slug":"navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo","status":"publish","type":"post","link":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/","title":{"rendered":"Navantia and Windar to build 21 monopiles for Iberdrola&#8217;s Windanker offshore wind farm in Germany"},"content":{"rendered":"\n<p class=\"has-small-font-size\"><strong>The Diplomat<\/strong><\/p>\n\n\n\n<p><strong>The business alliance formed by Navantia Seanergies and Windar Renovables will build for Iberdrola a total of 21 monopiles for the Windanker offshore wind farm in German waters in the Baltic Sea, which will have a capacity of 315 megawatts (MW) once it is commissioned in 2026, the companies announced.<\/strong><\/p>\n\n\n\n<p>This is the fourth order of this kind of structures for the consortium, in which the public naval group acts through its division Navantia Seanergies, and the \u2018second that Iberdrola contracts for this type of foundation\u2019.<\/p>\n\n\n\n<p>The production of these infrastructures will be developed in the joint facilities of the business alliance in the Navantia shipyard in Fene and will involve 420,000 hours of work during ten months, with \u2018around 210 jobs between Navantia, Windar and auxiliary industry\u2019.<\/p>\n\n\n\n<p>These substructures, according to Navantia and Windar, will have \u2018maximum dimensions of 84 metres in length, 10 metres in diameter and 2,100 tonnes in weight\u2019 and will be located in a park in German waters.<\/p>\n\n\n\n<p>The Windanker site, according to both companies, \u2018will have a capacity of 315 megawatts once it is commissioned in 2026, incorporating 15 megawatts of new generation turbines that will supply the German electricity market\u2019.<\/p>\n\n\n\n<p>In view of this plan, they have indicated that it \u2018demonstrates the leadership\u2019 of the consortium in this field by adding \u2018a new contract to those already awarded for a value of more than 1,000 million euros, thus consolidating a relationship of more than nine years with Iberdrola, with orders for wind farms in the United Kingdom, Germany, France and the United States\u2019.<\/p>\n\n\n\n<p>Navantia&#8217;s chairman, Ricardo Dom\u00ednguez, said that the contract \u2018contributes to boosting work at the shipyard and the development of the offshore wind supply chain\u2019 in Spain \u2018preparing it for a growing demand that has only just begun\u2019.<\/p>\n\n\n\n<p>For his part, Windar Renovables CEO Orlando Alonso said the order is \u2018further evidence of the high level of quality of our products and the reliability of our processes\u2019 and predicted \u2018a strong increase in activity in the sector\u2019.<\/p>\n\n\n\n<p>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Diplomat The business alliance formed by Navantia Seanergies and Windar Renovables will build for Iberdrola a total of 21 monopiles for the Windanker offshore wind farm in German waters in the Baltic Sea, which will have a capacity of 315 megawatts (MW) once it is commissioned in 2026, the companies announced. This is the [&hellip;]<\/p>\n","protected":false},"author":240,"featured_media":89524,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":{"subtitle":"","format":"standard","video":"","gallery":"","source_name":"","source_url":"","via_name":"","via_url":"","override_template":"0","override":[{"template":"2","single_blog_custom":"","parallax":"1","fullscreen":"1","layout":"right-sidebar","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"top","share_float_style":"share-monocrhome","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","show_post_author_image":"0","show_post_date":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","show_post_reading_time":"0","post_reading_time_wpm":"300","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_prev_next_post":"0","show_popup_post":"1","number_popup_post":"1","show_author_box":"1","show_post_related":"0","show_inline_post_related":"0"}],"override_image_size":"0","image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post":"0","trending_post_position":"meta","trending_post_label":"Trending","sponsored_post":"0","sponsored_post_label":"Sponsored by","sponsored_post_name":"","sponsored_post_url":"","sponsored_post_logo_enable":"0","sponsored_post_logo":"","sponsored_post_desc":"","disable_ad":"0"},"jnews_primary_category":{"id":"","hide":""},"jnews_social_meta":{"fb_title":"","fb_description":"","fb_image":"","twitter_title":"","twitter_description":"","twitter_image":""},"jnews_override_counter":{"override_view_counter":"0","view_counter_number":"0","override_share_counter":"0","share_counter_number":"0","override_like_counter":"0","like_counter_number":"0","override_dislike_counter":"0","dislike_counter_number":"0"},"jnews_post_split":{"enable_post_split":"0","post_split":[{"template":"1","tag":"h2","numbering":"asc","mode":"normal","first":"0","enable_toc":"0","toc_type":"normal"}]},"footnotes":""},"categories":[51,187],"tags":[],"class_list":["post-89517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breves","category-in-brief"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Navantia and Windar will make monopiles for Iberdrola in Germany<\/title>\n<meta name=\"description\" content=\"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navantia and Windar will make monopiles for Iberdrola in Germany\" \/>\n<meta property=\"og:description\" content=\"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\" \/>\n<meta property=\"og:site_name\" content=\"thediplomatinspain.com\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/thediplomatinspain\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-17T04:01:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"422\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Luis Ayllon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@diplomatinspain\" \/>\n<meta name=\"twitter:site\" content=\"@diplomatinspain\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luis Ayllon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\"},\"author\":{\"name\":\"Luis Ayllon\",\"@id\":\"https:\/\/thediplomatinspain.com\/#\/schema\/person\/dc104cdee1655e3c24ea3cc81edfd36b\"},\"headline\":\"Navantia and Windar to build 21 monopiles for Iberdrola&#8217;s Windanker offshore wind farm in Germany\",\"datePublished\":\"2024-07-17T04:01:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\"},\"wordCount\":343,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/thediplomatinspain.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg\",\"articleSection\":[\"Breves\",\"In brief\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\",\"url\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\",\"name\":\"Navantia and Windar will make monopiles for Iberdrola in Germany\",\"isPartOf\":{\"@id\":\"https:\/\/thediplomatinspain.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg\",\"datePublished\":\"2024-07-17T04:01:00+00:00\",\"description\":\"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany\",\"breadcrumb\":{\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage\",\"url\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg\",\"contentUrl\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg\",\"width\":750,\"height\":422,\"caption\":\"Construction of Navantia's offshore wind turbine cages. Photo: Navantia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/thediplomatinspain.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Navantia and Windar to build 21 monopiles for Iberdrola&#8217;s Windanker offshore wind farm in Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thediplomatinspain.com\/#website\",\"url\":\"https:\/\/thediplomatinspain.com\/\",\"name\":\"thediplomatinspain.com\",\"description\":\"Diario digital de referencia para diplom\u00e1ticos y empresas\",\"publisher\":{\"@id\":\"https:\/\/thediplomatinspain.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thediplomatinspain.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/thediplomatinspain.com\/#organization\",\"name\":\"thediplomatinspain.com\",\"url\":\"https:\/\/thediplomatinspain.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thediplomatinspain.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/06\/logo_the_diplomat.png\",\"contentUrl\":\"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/06\/logo_the_diplomat.png\",\"width\":284,\"height\":77,\"caption\":\"thediplomatinspain.com\"},\"image\":{\"@id\":\"https:\/\/thediplomatinspain.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/thediplomatinspain\",\"https:\/\/x.com\/diplomatinspain\",\"https:\/\/www.youtube.com\/channel\/UCK0mRqeeZDKdFeiFQZLcH2A\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/thediplomatinspain.com\/#\/schema\/person\/dc104cdee1655e3c24ea3cc81edfd36b\",\"name\":\"Luis Ayllon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g\",\"caption\":\"Luis Ayllon\"},\"url\":\"https:\/\/thediplomatinspain.com\/en\/author\/layllon\/\"},{\"@type\":[\"Organization\",\"NewsMediaOrganization\"],\"@id\":\"https:\/\/thediplomatinspain.com\/en\/#organization\"},{\"@type\":\"SiteNavigationElement\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/#site-navigation\",\"cssSelector\":[\".cib-main-menu\"]},{\"@type\":\"WPHeader\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/#header\",\"cssSelector\":[\".cib-header\"]},{\"@type\":\"WPFooter\",\"@id\":\"https:\/\/thediplomatinspain.com\/en\/#footer\",\"cssSelector\":[\".cib-footer\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navantia and Windar will make monopiles for Iberdrola in Germany","description":"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/","og_locale":"en_US","og_type":"article","og_title":"Navantia and Windar will make monopiles for Iberdrola in Germany","og_description":"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany","og_url":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/","og_site_name":"thediplomatinspain.com","article_publisher":"https:\/\/www.facebook.com\/thediplomatinspain","article_published_time":"2024-07-17T04:01:00+00:00","og_image":[{"width":750,"height":422,"url":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg","type":"image\/jpeg"}],"author":"Luis Ayllon","twitter_card":"summary_large_image","twitter_creator":"@diplomatinspain","twitter_site":"@diplomatinspain","twitter_misc":{"Written by":"Luis Ayllon","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#article","isPartOf":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/"},"author":{"name":"Luis Ayllon","@id":"https:\/\/thediplomatinspain.com\/#\/schema\/person\/dc104cdee1655e3c24ea3cc81edfd36b"},"headline":"Navantia and Windar to build 21 monopiles for Iberdrola&#8217;s Windanker offshore wind farm in Germany","datePublished":"2024-07-17T04:01:00+00:00","mainEntityOfPage":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/"},"wordCount":343,"commentCount":0,"publisher":{"@id":"https:\/\/thediplomatinspain.com\/#organization"},"image":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage"},"thumbnailUrl":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg","articleSection":["Breves","In brief"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/","url":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/","name":"Navantia and Windar will make monopiles for Iberdrola in Germany","isPartOf":{"@id":"https:\/\/thediplomatinspain.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage"},"image":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage"},"thumbnailUrl":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg","datePublished":"2024-07-17T04:01:00+00:00","description":"Navantia Seanergies and Windar Renovables will build 21 monopiles for Iberdrola for the Windanker offshore wind farm in Germany","breadcrumb":{"@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#primaryimage","url":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg","contentUrl":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/07\/navantia.jpg","width":750,"height":422,"caption":"Construction of Navantia's offshore wind turbine cages. Photo: Navantia"},{"@type":"BreadcrumbList","@id":"https:\/\/thediplomatinspain.com\/en\/2024\/07\/17\/navantia-and-windar-to-build-21-monopiles-for-iberdrolas-windanker-offshore-wind-farm-in-germany-the-diplomat-the-business-alliance-formed-by-navantia-seanergies-and-windar-renovables-will-build-fo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/thediplomatinspain.com\/en\/"},{"@type":"ListItem","position":2,"name":"Navantia and Windar to build 21 monopiles for Iberdrola&#8217;s Windanker offshore wind farm in Germany"}]},{"@type":"WebSite","@id":"https:\/\/thediplomatinspain.com\/#website","url":"https:\/\/thediplomatinspain.com\/","name":"thediplomatinspain.com","description":"Diario digital de referencia para diplom\u00e1ticos y empresas","publisher":{"@id":"https:\/\/thediplomatinspain.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thediplomatinspain.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/thediplomatinspain.com\/#organization","name":"thediplomatinspain.com","url":"https:\/\/thediplomatinspain.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thediplomatinspain.com\/#\/schema\/logo\/image\/","url":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/06\/logo_the_diplomat.png","contentUrl":"https:\/\/thediplomatinspain.com\/wp-content\/uploads\/2024\/06\/logo_the_diplomat.png","width":284,"height":77,"caption":"thediplomatinspain.com"},"image":{"@id":"https:\/\/thediplomatinspain.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/thediplomatinspain","https:\/\/x.com\/diplomatinspain","https:\/\/www.youtube.com\/channel\/UCK0mRqeeZDKdFeiFQZLcH2A"]},{"@type":"Person","@id":"https:\/\/thediplomatinspain.com\/#\/schema\/person\/dc104cdee1655e3c24ea3cc81edfd36b","name":"Luis Ayllon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f21ac69160fc117a978be5d7c11b0dfeaaf5460563d29d1a332a0eb24580f103?s=96&d=mm&r=g","caption":"Luis Ayllon"},"url":"https:\/\/thediplomatinspain.com\/en\/author\/layllon\/"},{"@type":["Organization","NewsMediaOrganization"],"@id":"https:\/\/thediplomatinspain.com\/en\/#organization"},{"@type":"SiteNavigationElement","@id":"https:\/\/thediplomatinspain.com\/en\/#site-navigation","cssSelector":[".cib-main-menu"]},{"@type":"WPHeader","@id":"https:\/\/thediplomatinspain.com\/en\/#header","cssSelector":[".cib-header"]},{"@type":"WPFooter","@id":"https:\/\/thediplomatinspain.com\/en\/#footer","cssSelector":[".cib-footer"]}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/posts\/89517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/users\/240"}],"replies":[{"embeddable":true,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/comments?post=89517"}],"version-history":[{"count":0,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/posts\/89517\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/media\/89524"}],"wp:attachment":[{"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/media?parent=89517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/categories?post=89517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thediplomatinspain.com\/en\/wp-json\/wp\/v2\/tags?post=89517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}